Our Engineering team has extensive experience in installation of Mobile Offshore Unit (MOU) and Mobile Offshore Drilling Unit (MODU) ranging from site appraisal, transportation (location move), foundation assessment for jack-ups, mooring analysis for floaters to structural assessment of MOU/MODU.

  • Towage study/ Dry Transportation Analysis
  • Float-On and Float-Off Analysis
  • Desktop Review of Geotechnical and Geophysical Data
  • Planning and QA/QC of Geotechnical and Geophysical Site Investigation and Laboratory Testing
  • Foundation Assessment for Installation and Removal of Jack-Up including Geohazard Assessment and Mitigations
    • Punch-through potential
    • Sliding potential/Interaction with old footprints
    • Perforation drilling operation
  • Site Specific Assessment / Structural Integrity Assessment of Jack-Up
  • Mooring Analysis